Not known Facts About Drilled Pile Foundations BD
In this process, a round gap is excavated up on the depth at which the soil will stand unsupported (about 0.5m for comfortable clay and 2m for rigid clay). Vertical boards often called laggings, are then established in situation around the excavated face and they are held tightly versus the soil by metal rings.two. An auger is hooked up to some sha